Shandong, China
Business Type:
Manufacturer/Factory
Business Range:
Industrial Equipment & Components, Transportation
Type of Ownership:
Limited Company
Plant Area:
101~500 square meters
Management System Certification:
ISO 9001, ISO 9000, QC 080000
OEM/ODM Service
Sample Available

Aluminum Alloy Lifting Platform, Dual Mast Platform, Aluminum Aerial Elevator manufacturer / supplier in China, offering 6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform, 5000kg 5ton Hydraulic Truck Electric Table Scissor Lift, Semi Electric Manual Moving Glass Lifting Equipment and so on.

Gold Member Since 2015
Audited Supplier
Supplier Homepage Products Aluminum Work Platform Semi Electric Aluminum Work Platform 6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform

6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $1,990/ Piece
Port: Qingdao, China
Production Capacity: 20, 000PCS/Year
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram
Application: Workshop Crane, Shipboard Crane, Warehouse Crane, Building Crane, Decoration
Lift Mechanism: Lift Chain
Carrying Capacity: Middle-Level
Moves: Moving
Driven Type: DC
Running Mode: Moving

You Might Also Like

Loading...

Basic Info

Model NO.: DMA
Feature: Explosion-Proof, Insulating, Spillover Valve
Certification: GS, CE, ISO 9001
Max Platform Height: 6m, 8m, 10m
Load Capacity: 125kg
Platform Size: 600*600mm
Power: AC(Without Battery) or DC(with Battery)
Lifting Motor: 0.75kw
Charge: 24V/10A
Battery: 2*12V/60ah
Quanlity Warranty: 12month
Failure Rate: Extremely Low
Delivery Time: 15-20days
Trademark: SINOFIRST
Transport Package: High Quality Seaworthy Package
Specification: CE, ISO, SGS
Origin: China
HS Code: 8428909090

Product Description

6m Double Mast Aluminum Alloy Lifting Platform

Dual Mast Aluminum Lift Platform  is developed from Single Mast Aluminum Lift Platform.
Compared with single mast aluminum lift platform, dual mast lift platform load capacity is 200kg, lifting height from 6m to 14m.

Introduction:
Moving by man manully.
Lifting by AC(without battery) power or DC(with battery) power
AC: Voltage as per your local standard.
DC: Battery supply power.


Configuration:
Dual controls operation
Multi-guide pulley on mast
Dual base platform
Chassis with level gauge
Over load protection
24V safe control voltage 
Double safety protection with leveling stabilizers and outriggers support
No-marking wheels
Low maintenance requirements will save you time and money.


Safety of Electrical and hydraulic System
Ergonomic control panel, power indicator, electric shock protector, circuit breaker etc. 
Built in pressure release valve
Emergency stop buttons are available both on the platform and on the low position.
Emergency lowering device 
Broken valve activated automatically to stop the flowing of hydraulic oil in case any pipe broken.


Specification:
ModelDMA06DMA08DMA10DMA12
Max. Platform Heightmm600080001000012000
Max.Working  Height800010001200014000
Min. Platform Height18002020
Ground Clearance80
Lift Rated Capacitykg200200200
Platform Sizemm1230*6201430*6201530*620
Outspread Size1880*17602220*19602250*2750
Electrical SourceACvas per customers' requirement
DC12
Aneroid Batteryv/Ah150
Chargerv/A12/15
Lifting MotorACv/kw1.5
DC2.5
Overall Lengthmm156017901840
Overall Width840890
Overall Height18602080
OverallACkg500580650750
Net WeightDC530610680780

6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform
6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform
6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform


Our Service:

1.We can design the customerized Dual mast  lift platform as per your requirement.
2.The most suitable model will be recommended to you once we know about your requirement.
3.Shipment can be arranged from our port to your destination port.
4.Opetion video can be sent to you if needed.
5.Maintenance video will be given once the dual mast  lift platform break down to help you repair.
6.Parts of dual mast  lift platform can be sent to you by express within 7 days if needed. 

Frequently Asked Questions:

1.How can customer  buy parts once it break down?
The dual mast  lift platform adopt most of the common parts of hardware.You can buy the parts in your local hardware market.

2.How can customer repair the dual mast lift platform?
One of the great advantage of the equipment is with very very low failure rate.Even it breaks down,we can guide to repair it by video and repair instruction.

3.How long is the quality guarantee?
One year quality guarantee.If it breaks down within one year,we can send the parts free of charge to you.


Factory show:
6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform
6m Double Mast Aluminum Alloy Lifting Platform/Hydraulic Aluminum Alloy Aerial Lift Work Platform

Contact Information:
Vera (Sales Manager)
Qingdao Sinofirst Machinery Co., Ltd
Add:Danshan Industrial Park, Chengyang,Qingdao China
Tel:+86-532-66851115 Fax: +86-532-66851125
Mob:+86-18562698580  URL: www.liftawp.com

Send your message to this supplier

*From:
*To:
avatar Miss Vera Jiang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now